Strong comprehensive performance:
Lifting moment 425t.m, 26 diameter steel wire rope, lifting single rope pulling force 12t, large pulling force
High operating efficiency:
– The lifting speed is 142m/min using Linde main pump and post-valve compensation system
– Load feedback integrated main valve, energy saving and high efficiency, good micro-movement
– The maximum transportation width of a single piece is 3m, and it is shipped by 3 vehicles in all working conditions
– Graded load settings, suitable for construction in special sites
Wind power auxiliary lifting tools:
ZCC1000V is suitable for auxiliary hoisting of 900T-1000T crawler cranes
Typical working conditions are a 22-meter main boom with a 6-meter-wide lifting capacity of 63.9T, which is the strongest in the industry.
More advanced configuration:
– Equipped with a rotating virtual wall function, making operations in small spaces safer
– Standard 10.4-inch torque limiter touch screen, integrated point-touch bus button panel, easy to operate
– Standard panoramic tilt control room with wide field of vision and comfortable control
More complete functions:
– Single-rate rope threading under fixed jib working conditions, one-click switching between main and auxiliary hooks
– Main and auxiliary winches have optional free-fall hook functions